A major road in Wales, the A40 between Llandovery and Halfway, will be undergoing “vital” roadworks, leading to the closure of a lane for eight months starting on October 12, 2024, and scheduled to end on May 6, 2025. The approximately six-mile stretch of road will see repairs being carried out on a slope that is prone to landslides. Additionally, a new drainage system will be installed, and safety barriers will be erected as part of the works to ensure the road’s safety and long-term stability.
During the roadworks, there will be some weekend and evening closures, with a single lane closure facilitated by temporary traffic signals on weekdays. These measures are put in place to minimize disruption as much as possible for road users. A temporary 40mph speed limit will also be enforced throughout the duration of the works. The westbound lane closure outside of the road closure periods is necessary to protect road users from any temporary instability of the cutting slope during the repair works.
The Welsh Government emphasized the importance of these roadworks for the future resilience of the road, stating, “This work is essential to ensure the road can remain open in the years to come.” They acknowledged that while the roadworks might cause short-term disruption, they thanked drivers for their patience during this period. The lane closure will be reviewed as the work progresses, and it will be removed whenever possible throughout the project.
In a statement, the Welsh Government highlighted the significance of the road repair project and its necessity for the road’s future viability. They expressed gratitude to drivers for their understanding and patience during the temporary inconvenience caused by the roadworks. The planned road repairs aim to ensure the safety and stability of the A40 in the long term.
As the roadworks progress, the Welsh Government will assess the situation to minimize disruptions. They urge drivers to adhere to the temporary speed limits and traffic signals for their safety and the safety of workers on-site. The roadworks are vital for maintaining the infrastructure and safety of the road for years to come.
In conclusion, the roadworks on the A40 between Llandovery and Halfway are crucial for the safety and long-term stability of the road. Drivers are advised to plan their journeys accordingly, follow the temporary speed limits and traffic management measures, and cooperate with the authorities to ensure a smooth flow of traffic during the repair works.